Double Four Patch Progress

This week I finished putting the borders on my Double Four Patch quilt. Friday night I loaded this quilt on the long arm and I finished the quilting before supper Saturday night. I was still inspired and my energy levels were high so after supper last night I continued on and finished machine sewing the binding to the front of this quilt. I now only have the hand sewing of the binding to the back of the quilt to do.

The weather forecast is for cool days this week–temperatures below zero. This is perfect weather for stitching binding as you can enjoy the warmth of the quilt as it is draped over your lap while hand stitching. You know where

you can find me in the evenings this week!

First Finish for 2008

This is my first quilted finish for 2008–Mexico Strings. I quilted this quilt on New Year’s Day and put the last hand stitch in the binding on January 9.


This quilt finished 47 1/4″ x 62 1/4″ and will be making its way to Pam for her Quilts For Mexico project. Pam will be taking the donated quilts to an orphanage in Mexico later this year. I encourage you to make a quilt and donate it to Pam’s project to help her reach her goal of 200 quilts!

The blocks for this quilt were foundation pieced onto used color catcher sheets. Once the sheets are covered with strings, I trimmed the blocks to 4″ x 9″. The sashing is cut 2″ x 9″ and cornerstones are 2″ square. The outer green border is cut 6″ wide–no special reason other than that is the width of my ruler (6″) so strips are easy to cut.